ITS / How we work
How we work
We request installation references, operating conditions and test results for the selected model. Demonstrations, trials with your material or factory visits can be arranged within the agreed scope. We compare the evidence with your requirements before purchase approval.
One point of contact for ordering equipment, components and consumables from abroad. We source and verify solutions, organise manufacture, delivery, import documentation, commissioning and ongoing service. One team coordinates the entire order.
01. Start with what you have
Send a part number, nameplate photo, drawing, sample, specification or production problem. A finished technical brief is not required. We establish whether you need a machine, line, spare part, materials, laboratory equipment or engineering support.
For machinery we define output and site conditions; for parts, function, interfaces and load; for consumables, specification, quantity and replenishment frequency. We record downtime urgency, seasonal deadlines, budget and confidentiality needs, then agree a coordinator, communication channel and first deliverable.
02. Find an overseas manufacturer
We source equipment, components and materials from overseas manufacturers and suppliers against your requirements. Country selection considers technology, availability, lead time, service and supply feasibility. The website catalogue describes sourcing capabilities; actual stock and dispatch dates are confirmed in the quotation.
We identify the manufacturer, seller and technical support provider and request configuration, documentation and production timing. Original parts, compatible alternatives and custom manufacture are clearly distinguished. Changes to brand, material, assembly or revision require your agreement.
03. Check the model in operation
For standard machines we seek operating sites using the proposed model and a comparable configuration. With the operator’s permission, we arrange technical interviews, live video or an agreed site visit. We examine material, achieved output, operating history, failures and service experience.
A manufacturer’s promotional video is not independent operational evidence. We record source, date and verification limits. If no reference site is accessible or the model is new, we disclose that and propose tests on your material or a pilot rather than an unsupported recommendation.
04. Reproduce a part or redesign a process
Have a part but no supplier or drawing? We organise reverse engineering and manufacture from a sample. We assess feasibility, measure or scan, and establish material, treatment, coating, tolerances, fits and loads. Wear must be considered: copying worn geometry can reproduce the fault.
We agree drawings, a first article and dimensional and functional checks before series production. Where the design or process causes the problem, we propose redesign, material changes, automation or retrofit. Equivalence is assessed by function under defined operating conditions.
05. Compare total cost and terms
We compare equal scopes: equipment, options, tooling, software, licences, documents, spares and service. The budget identifies manufacture, inspection, packing, freight, insurance, import processing, applicable charges, unloading, installation and startup, distinguishing included, optional and provisional amounts.
We agree currency, payment stages and release evidence. Recurring consumables require minimum order, shelf-life and replenishment planning; machinery requires running-cost and repair considerations. Unresolved costs are visible before commitment, and budget changes require agreement.
06. Agree responsibilities and milestones
We coordinate the agreed project across manufacturer, technical specialists, carrier, import processing and service. Your ITS coordinator follows issues through to the agreed outcome. Our responsibilities and deviation procedures are defined in the contract and specification.
Before payment we fix model or drawing, materials, configuration, acceptance criteria, milestones, warranty and change control. Supplier, importer, documentation owner, site preparation and commissioning roles are explicit. Status updates identify progress, next action, risks, decisions and responsible people.
07. Verify before dispatch
We track agreed manufacturing checkpoints, completeness and corrective actions. Machinery may require factory acceptance testing (FAT) covering functions, safeguards and agreed performance, including your material where specified. Parts require dimensional, material and finishing checks; materials and reagents require batch quality, packaging, expiry and relevant documents.
Inspection scope is agreed beforehand: sampling, full inspection and prototype tests provide different evidence. We record deviations, corrective work and rechecks. Dispatch readiness is supported by results, not solely a supplier message.
08. Arrange delivery and import processing
We organise international freight and customs processing within the agreed supply scope. Routing considers weight, dimensions, fragility, storage and deadlines. Heavy machinery requires securing, corrosion protection and lifting plans; electronics require impact and moisture protection; sensitive materials require appropriate temperature and load compatibility.
Specialists prepare classification information, commercial and transport documents and required conformity evidence. We organise applicable customs-charge and import-tax calculations and accounting documents. Importer, insurance, delivery point, unloading and risk transfer are agreed before dispatch. We provide shipment updates and report changes.
09. Prepare the site and receive the shipment
Before arrival we review access, foundations, loads, power, air, water, extraction and maintenance clearance. Unloading, lifting, position and connections are planned. Parts require a maintenance window, tools and mating assemblies; materials require suitable storage and incoming checks.
Receipt includes package count, identification, completeness and visible condition. Damage or shortages are documented and handled through the agreed claims process. Receiving packages does not replace technical acceptance; its criteria and next stage are defined in advance.
10. Commission and verify performance
We organise installation support, commissioning and specialist participation within the agreed scope. Connections, settings, calibration, safeguards and line interfaces are checked before trial cycles and tests with the agreed product. Performance is assessed against order criteria such as output, accuracy, quality and stability.
Site acceptance testing (SAT) validates operation in your conditions. Deviations receive corrective actions, owners and recheck arrangements. Parts require fit and functional verification; consumables require trial use and batch-release criteria rather than full line commissioning.
11. Hand over knowledge and documentation
We organise operator and maintenance training covering startup, shutdown, changeover, checks, servicing and common faults. Practical training uses the supplied equipment or another agreed format; language and translation needs are settled beforehand.
The agreed handover includes manuals, drawings, spares lists, test records, warranty terms and service contacts. For automation we agree authorised configuration backups, licensing information and access; for materials, batch and storage documents. Your team receives information for operation and future orders.
12. Support you after the sale
After delivery we organise service: record the issue, collect fault data, coordinate manufacturer and specialists, and arrange diagnosis, repair or replacement. An ITS coordinator follows the case through to an agreed resolution. Warranty, response times, site visits and costs are defined for each order; manufacturer promises are checked before purchase.
We plan critical spares, consumables, preventive maintenance and repeat supply. Obsolete components may require alternatives or manufacture. Recurring failures may need redesign. Actions and recovery results remain documented for future support.
Raw materials & industrial inputs from Asia
Start with a specification, the current material’s quality certificate or a process requirement. An alternative requires agreed properties and a trial in your production process.
A comparison of suitable offers: manufacturer, grade and properties, minimum lot, samples, quality documents, timing and total delivered cost. Agree verification scope and acceptance conditions before purchase.
All raw materials & inputsManufacturers and equipment origin
Sourcing focuses on manufacturers and suppliers in China. Each order needs a verifiable manufacturer, an explicit configuration and equipment suited to your task.
Read more ↗02Supplier verification and quality control
Control works when measurements, acceptance limits and decision-makers are defined in advance. The inspection plan depends on the product and order risks.
Read more ↗03Delivery and equipment receipt
Route and cost depend on dimensions, weight, packaging, urgency and destination. The proposal should show the entire chain to the agreed delivery point.
Read more ↗04Cost, contract and payment
Offers are easier to compare when their scope matches. Equipment price and the full budget to put it into operation are different measures.
Read more ↗05Warranty, support and repair
Warranty is practical when you know whom to contact, how diagnosis works and how operation will be restored.
Read more ↗06Spare parts and operational recovery
Without an exact part number, start with the nameplate, photos, dimensions and fault description. The goal is confirmed compatibility, not just a similar-looking part.
Read more ↗07Questions before placing an order
Concise answers about selection, origin, documentation and acceptance. Specific terms form part of the agreed proposal and contract.
Read more ↗08Documents for an informed purchase
Good documents help compare offers, obtain internal agreement and accept what was ordered. The following document scope can be included in your project.
Read more ↗09Work with ITS
Two ways to participate: refer companies needing supply or engineering, or contribute to order execution. Each path has its own responsibilities and terms.
Read more ↗10Site preparation and commissioning
Startup begins before equipment arrives. Site, material, staff and document readiness affect the transition from delivered machinery to a working process.
Read more ↗11Preparing agricultural operations for the season
Seasonal readiness involves the full chain: intake, cleaning, drying, storage, processing and dispatch. Selection starts with your product and actual operating conditions.
Read more ↗